Bathroom rewires · NAPIT approved · Worcester Park, KT4
Bathroom rewires in Worcester Park
Water and electricity make the bathroom the room with the strictest wiring rules in the house. We work with your bathroom fitter to get every switch, socket and fan in the right place, from the extractor to the shaver point, for homes in Worcester Park, Banstead, Sutton, Ewell and Cheam.
✓ Free quote
✓ Built around the zones
✓ Certified
Qualified, insured and on your doorstep
AEI Electrical is run by Matthew Ayley, with Taylor on the team. In more than ten years of domestic and commercial work across South London and Surrey, our bathroom jobs have run from repairing and replacing extractor fans to new bathroom lights and switches, and the wiring for brand-new bathrooms.
NAPIT approved
Qualified inspectors
£2m insured
Public liability cover
5.0 on Google
100+ reviews
Based in Worcester Park
10+ years’ experience
What it is
What is a bathroom rewire?
A bathroom rewire replaces or reworks the wiring in the room with the bath or shower: the light and its switch, the extractor fan, a shaver socket, a heated towel rail, and the cables that feed them. Because people are wet and barefoot here, the wiring regulations (BS 7671) treat it as a special location with rules of its own.
A full bathroom rewire strips the old wiring out and starts again around the new layout. A partial one keeps what’s sound and changes only what the new room needs, such as moving a switch or adding a fan.
In England, adding or altering anything in the space around a bath or shower has to be notified to building control, even a single new light point. So does any brand-new circuit.
What you get
Wired for water and steam
You get every bathroom circuit on 30mA RCD protection, switches and sockets placed where the zones allow, a fan that actually clears the steam, and fittings rated for where they sit.
We test it all before the room goes back into use, notify building control on your behalf, and send the certificate for your house file.
1
Measure
2
Wire
3
Sign off
Worth a look
Signs your bathroom electrics need work
A new bathroom on order
The electrics go in before the walls are boarded and tiled.
Mould and a mirror that stays misted
No fan, or one too weak to clear the steam.
A wall switch beside the bath
An ordinary switch where splashes from the bath or shower reach.
Leads trailing in from the landing
Hairdryers and heaters plugged in through the doorway.
No RCD on the bathroom circuits
Lights, fan and shower should all have one.
An EICR that flagged the bathroom
Missing RCDs, bonding, or fittings too close to water.
Who we rewire bathrooms for
Nearly every bathroom job we do begins with one of these four.
Bathroom refits
The old suite is coming out and the fitter needs cables placed before boarding and tiling. We plan the electrics from their layout.
En-suites and loft conversions
A new shower room upstairs usually needs a fan vented outside, lighting and often a new circuit, all notified to building control.
Wet rooms
With no shower tray, zone 1 reaches further across the room, so switches, fan and towel rail need placing with extra care.
Landlords
A tenant’s bathroom flagged on an EICR, or mould from a missing fan, put right with certificates for your records.
What can go where in a bathroom?
A standard 13A socket
At least 3 m from zone 1
A shaver socket
Zone 2, out of the shower spray
A light switch
Pull cord, or a switch outside the zones
An extractor fan
Zones 1 and 2 if rated IPX4
An electric towel rail
Fused connection, sited for its zone
Light fittings
See our lighting page
Every circuit serving the room needs 30mA RCD protection, whatever is on it. Zones are measured from your own bath or shower, so we check them on site before fixing anything.
In step with the refit
How a bathroom rewire works
1
Send the layout
The fitter’s drawing or a sketch, with the bath marked.
2
Measure the zones
We measure up and check the fuse board and RCDs.
3
Itemised quote
Fan, switches, sockets and circuits set out in writing.
4
Walls open
Cables and the fan route set before boards go up.
5
After tiling
Fan, switches, shaver point and towel rail connected.
6
Test and notify
RCDs tested, certificate issued, building control told.
How long it takes
Set around your refit
The work slots into gaps in the refit, so our dates follow the fitter’s. You’ll have them in writing before the old suite comes out.
Help us get it right
✓
Share the fitter’s plan, with the bath, shower and basin marked.
✓
Choose the fan, towel rail and any mirror early, and keep the manuals.
✓
Decide whether you’d like a shaver socket, and roughly where.
✓
Arrange somewhere else to wash while the bathroom is out of action.
✓
Clear a way into the loft, or to the ceiling void above the room.
✓
The bathroom circuits will be switched off during parts of the work.
What we check in the room
In a bathroom, a few centimetres decide what’s allowed. At the visit we go through:
✓
The zones, measured from your actual bath, shower or tray, not a diagram
✓
RCD protection, on every circuit that serves the room or passes through it
✓
Bonding, the earth links to metal pipes, and whether extra bonding is needed
✓
The fan, where it can vent outside, and how it will switch on and off
✓
Switches and sockets, pull cord or outside switch, and where a shaver point can go
✓
Heating, the towel rail position, and any underfloor heating going under the tiles
Old wiring that tests well and sits outside the zones can usually stay. We’ll show you what’s being kept and what’s replaced.
Why choose AEI
✓
NAPIT approved, so our work is checked and our electricians are qualified
✓
Over 10 years’ experience with domestic and commercial electrics
✓
£2 million public liability insurance
✓
Local to you. We’re based in Worcester Park, KT4, so most jobs are a short drive away
✓
Honest quotes. We only quote for the work that actually needs doing
✓
One team for everything. All our work and parts are guaranteed
✓
5.0 on Google from 100+ reviews
No surprises
Quoted before the tiles go up
What you pay depends on how much old wiring is replaced, the fan and its route outside, what goes on the walls (shaver point, towel rail, mirror), and whether the fuse board needs RCD work. After the visit we send a free written quote, so the electrics sit in your bathroom budget from day one.
Before we start
Free quote
Every circuit
RCD protected
When it’s done
Notified
All our work
Guaranteed
Where most bathrooms land
After measuring and testing, we’ll tell you which of these your bathroom needs. Often it’s two.
The reason for each item is written on your quote in plain English.
Full
Full bathroom rewire
Worn cable or a completely new layout. The room is wired from scratch around the new suite.
Part
Partial rewire
The cable is sound, but a switch, light or towel rail sits in the wrong zone and has to move.
Fan
Fan fitted or upgraded
No extraction, or a fan too weak for the room. Wired so it can be isolated for servicing.
Bond
Bonding checked
With RCDs on every circuit and sound main bonding, extra bonding is often unnecessary. If not, it’s added.
The rules in numbers
The rules that shape a bathroom
BS 7671 Section 701 and the building regulations guidance on ventilation set these four figures. Between them, they decide where nearly everything goes.
Wiring rules
Section 701
30mA
RCD cover for every circuit in the room
3 m
Clearance from zone 1 for a standard socket
IPX4
Minimum water rating for a fan in zones 1 or 2
15 l/s
Minimum rate for an intermittent bathroom fan
The 15 l/s figure comes from Approved Document F, and it’s what the fan must move once it’s fitted, not just what the box says. Long or kinked ducting cuts the flow, so the route matters as much as the fan.
Extractor fans
Steamy bathroom, weak fan?
Black mould on the ceiling and a mirror that never clears usually mean the fan is missing, too weak, or switching off too soon. Here’s how we sort it:
✓
We check the room and where the fan can vent outside
✓
A fan rated for the zone it sits in
✓
Controls to suit: with the light, on a timer or humidity sensor
✓
An isolator outside the zones, so it can be serviced safely
✓
Tested, with the work notified where the rules require
“I booked AEI Electrical to replace two electric radiators, change a fan in the bathroom, stop my dimmable lights flashing and swap some light fittings. Matthew and Taylor were brilliant.”
Paul, customer review
Loft conversions
Adding an en-suite upstairs?
A new shower room in a loft or extension starts with nothing: no fan, no lights, no supply. It usually needs fresh cable from below, a fan vented through the roof or wall, and RCD protection on every circuit.
Bring us in while the builder is planning the room, so cable routes and the fan position are settled before the plasterboard goes up. An electric shower needs its own circuit, which our new circuits page covers.
In our customers’ words
5.0
from 100+ Google reviews
“Our go-to electrician - so helpful, polite, great work and reasonable. Will definitely use Matt again.”
Lisa Yates, customer review
“Really great work from the guys, quick and left the place very tidy. Would definitely use again.”
Mr Joe Robinson, customer review
We turn up when we say.
It’s the thing our customers mention most. Read what people across Worcester Park and Surrey say.
Related services
Finishing the bathroom off
Lights in the bathroom?
Lighting installations
Downlights and fittings rated for each water zone.
Learn more →
Electric shower?
New circuits and wiring
A dedicated shower circuit, sized for its power.
Learn more →
Warm floor under the tiles?
Electric heating installation
Underfloor heating planned in before the tiles go down.
Learn more →
Local coverage
Bathroom rewires across Worcester Park, Sutton and Surrey
From en-suites in Banstead to family bathrooms in Sutton and Epsom, we wire bathrooms across South London and Surrey. Being in KT4 makes it easy to drop in while the walls are still open.
Worcester Park
KT4 · our base
Sutton
SM1, SM2
Cheam
SM2, SM3
New Malden
KT3
Epsom
KT17 to KT19
Ewell
KT17, KT19
Banstead
SM7
Wallington
SM6
Tadworth and Kingswood
KT20
Not listed? We cover most of South London and Surrey. Call to check.
Bathroom electrics questions people ask us
Straight answers. If yours isn’t here, call and ask.
Need a quick answer?
Call 07914 615151
How much does a bathroom rewire cost?
It depends on how much wiring is replaced, the fan and how far it has to vent, what goes on the walls, and whether the fuse board needs RCD work. We look at the room, then send a free written quote with each item listed.
Can you have a plug socket in a bathroom?
Yes, but only 3 metres or more horizontally from the edge of zone 1, the space directly above the bath or shower. In most UK bathrooms that rules it out, which is why hairdryers usually plug in on the landing or in a bedroom. A shaver socket is the exception.
Where can a shaver socket go?
A proper shaver supply unit, with a built-in isolating transformer (made to BS EN 61558-2-5), can go as close as zone 2, as long as the shower can’t spray it directly. Shaver-only sockets without a transformer aren’t allowed in a bathroom at all. Either way, they’re for shavers and toothbrushes, not hairdryers.
Do bathroom light switches have to be pull cords?
No. A pull cord is the usual choice because its cord can safely hang inside the zones. A normal wall switch is fine too, as long as it’s outside the zones, and many people put it on the landing just outside the door.
Does a bathroom need an extractor fan?
If you’re adding a new bathroom or en-suite, building regulations expect extract ventilation, and the guidance sets 15 litres per second for an intermittent fan. Even where it isn’t strictly required, a fan that clears the steam is the best defence against mould and peeling paint.
Does all bathroom wiring need an RCD?
Yes. BS 7671 requires 30mA RCD protection for every circuit serving a room with a bath or shower, including the lights, fan, shower and towel rail, and for circuits that just pass through it. If your fuse board can’t provide it, we’ll explain the options before quoting.
Can I have an electric towel rail?
Yes. It’s usually wired in permanently through a fused connection unit placed where the zones allow, on an RCD-protected circuit, with the rail itself rated for its position. A plug-in towel rail isn’t the answer, because the socket rules still apply.
Do I need building control for bathroom electrics?
In England, for most of it. Adding or altering anything in the space around a bath or shower is notifiable, and so is any new circuit, such as one for an electric shower. Like-for-like repairs usually aren’t. We handle the notification and send you the certificate once it’s logged.
What’s different about wiring a wet room?
With no shower tray, zone 1 stretches 1.2 metres in every direction from where the water comes out, so far more of the room counts as close to water. Switches, the fan isolator and towel rail controls usually end up by the door or outside it.
What about an electric shower or underfloor heating?
We plan both in with the rest of the room. The shower circuit is covered on our new circuits page, and underfloor heating, which goes down before the tiles, on our electric heating page.
Book your bathroom visit
Send the fitter’s layout or a photo of the room, and tell us where the bath or shower will sit and when the old suite comes out. We’ll arrange a visit and send a free written quote.
Mon–Fri 7 am–7 pm · Sat–Sun 9 am–2 pm. AEI Electrical, Worcester Park, KT4.